Site Survey Methodology
Protocol for Environmental & Technical Infrastructure Audits
A successful network deployment is predicated on the accuracy of the initial site survey. This guide outlines the standardized methodology for auditing physical environments to ensure infrastructure compatibility, regulatory compliance, and long-term operational stability.
1. Objective and Scope
The primary objective of a technical site survey (TSS) is to identify physical constraints and opportunities within a facility before equipment procurement or installation. A comprehensive survey must account for:
- Pathways and containment (Conduits, Trays, Risers).The physical layout of conduits determines the long-term signal integrity of a facility. Improper bending radii or excessive lengths can introduce physical layer failures that are notoriously difficult to troubleshoot post-occupancy.
- Environmental variables (Thermal density, Humidity, EMI).
- Power availability and grounding integrity.
- Structural requirements (Load-bearing for racks).
2. Pre-Survey Preparation
Before arriving on-site, the diagnostic engineer must review the following documentation:
Floor Plans
Obtain the most recent CAD or Architectural PDF blueprints for scale validation.
Asset Log
Prepare high-resolution imaging devices for documenting IDF/MDF entry points.
3. The Tactical Site Checklist
Ensure every variable is logged according to the GridFix Standard TSS Protocol:
Site Environmental Audit
- Power Source AccessIs there a dedicated circuit within 2 meters of the proposed rack location?
- Grounding (Earth) Bus BarVerify presence of an existing Telecommunications Main Grounding Busbar (TMGB).
- Ambient TemperatureAudit if the room is actively cooled or requires additional ventilation/AC.
- Cable Pathway CapacityCheck existing conduit fill ratios (must not exceed 40% for new pulls).
- Structural ClearanceMinimum 36 inches (91cm) of front and rear clearance for equipment servicing.
4. LoS (Line-of-Sight) for Wireless
A professional site survey is the foundation of high-availability networking. Before a single cable is pulled, we must quantify the environment, identify EMI risks, and establish a baseline noise floor (SNR) for the facility.For wireless deployments, the survey must include a Fresnel zone audit. This involves identifying potential signal obstructions (HVAC ducts, industrial machinery) and measuring the noise floor (SNR) at the proposed mounting height.
Summary of Deliverables
A completed site survey should culminate in a Site Survey Report (SSR) containing:
- Red-lined blueprints showing actual pathways.
- Power and cooling calculations.
- Bill of Quantities (BoQ) for cabling and containment.
- Risk Register (e.g., Asbestos presence or restricted access times).