Site Survey Standards
Tactical checklist for power density, cooling capacity, and structural load verification.
Cabling Infrastructure
Fiber/Copper dress-out standards. Maintaining bend-radius integrity and port-mapping precision.
Hardware Commissioning
Step-by-step UAT for new switch/router clusters. From zero-touch-provisioning to traffic steering.
Thermal Management
Engineering hot/cold aisle containment. Monitoring Delta-T across high-density GPU racks.
Power & Distribution
ATS testing, UPS runtime validation, and PDU sequence-of-operations for redundant systems.
Documenting Assets
Using LLDP/SNMP to automate asset discovery and maintaining 99.9% accurate L1/L2 diagrams.
Compliance & Safety
OSHA/NFPA regulatory adherence. Fire suppression (FM200) and physical access control (PAC).